Rooted in Hawaiʻi. Built for participation.
← Back to HB1223
Read the measure

HB1223

Relating To Capital Improvement Projects For The Benefit Of The Thirty-eighth Representative District.

Selected version

Introduced· Jan 22, 2025

Open the official document ↗

This is a particular imported version. Later drafts may change its provisions, and a recorded vote is not automatically linked to this version.

Readable transcription of the selected official document, not a summary. [Underlined: …] and [Struck through: …] describe recognized source typography; they do not independently establish that wording was legally added or deleted. Layout, tables, and other typography may differ; consult the official document for authoritative wording and formatting. This version is not automatically the version considered in a particular vote.

HOUSE OF REPRESENTATIVES

H.B. NO.

1223

THIRTY-THIRD LEGISLATURE, 2025

STATE OF HAWAII

A BILL FOR AN ACT

relating to capital improvement projects for the benefit of the thirty-eighth representative district.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $113,914,843.20 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2025-2026 for the purpose of capital improvement projects for the thirty-eighth representative district, as follows:

1. Kipapa elementary school, Oahu

A. Design and construction for a new playground.

Design $30,000

Construction $300,000

Total funding $330,000

B. Plans, design, and construction for installation of security screens in building K.

Plans and design $13,000

Construction $130,000

Total funding $143,000

C. Plans, design, and construction to repaint the exterior of building L.

Plans and design $17,400

Construction $174,000

Total funding $191,400

D. Plans, design, and construction to replace the campus fire alarm system including system monitoring.

Plans and design $200,000

Construction $2,000,000

Total funding $2,200,000

E. Plans, design, and construction for installation of ceiling fans across campus.

Plans and design $18,000

Construction $180,000

Total funding $198,000

F. Plans, design, and construction for reroofing of P-15, P-16, P-17, and P-21.

Plans and design $13,000

Construction $130,000

Total funding $143,000

2. Mililani high school, Oahu

A. Construction of a career and technical education building.

Total funding $19,000,000

B. Construction of a swimming pool.

Total funding $20,000,000

C. Construction of a performing arts center.

Total funding $52,000,000

3. Mililani Ike elementary school, Oahu

A. Design and construction of a campus DDC replacement building.

Design $30,000

Construction $300,000

Total funding $330,000

B. Plans, design, and construction to resurface the cafeteria parking area of building C.

Plans and design $20,000

Construction $200,000

Total funding $220,000

C. Plans, design, and construction to repaint the exterior of building A.

Plans and design $14,000

Construction $140,000

Total funding $154,000

D. Plans, design, and construction to repaint the exterior of building C.

Plans and design $18,000

Construction $180,000

Total funding $198,000

E. Plans, design, and construction for drainage improvements on portable buildings.

Plans and design $17,500

Construction $175,000

Total funding $192,500

F. Plans, design, and construction to reconstruct the kitchen refrigerator and freezer in building C.

Plans and design $20,000

Construction $200,000

Total funding $220,000

G. Plans, design, and construction to replace the program bell campus wide.

Plans and design $48,000

Construction $480,000

Total funding $528,000

H. Plans, design, and construction for new playground equipment.

Plans and design $20,000

Construction $200,000

Total funding $220,000

4. Mililani Waena, Oahu

A. Design and construction for replacement of campus fire alarm system including system monitoring.

Design $200,000

Construction $2,000,000

Total funding $2,200,000

B. Plans, design, and construction to repair and replace fencing on the rear part of campus.

Plans and design $12,000

Construction $120,000

Total funding $132,000

C. Plans, design, and construction for phase 2 of campus wide structural repairs.

Plans and design $30,000

Construction $300,000

Total funding $330,000

D. Plans, design, and construction to replace existing waterline.

Plans and design $17,000

Construction $170,000

Total funding $187,000

E. Plans, design, and construction for playground equipment.

Plans and design $25,000

Construction $250,000

Total funding $275,000

5. Mililani Mauka elementary school, Oahu

A. Design and construction for replacement of air conditioning equipment in building A.

Design $90,000

Construction $900,000

Total funding $990,000

B. Plans, design, and construction for replacement of campus wide fire alarm system including system monitoring.

Plans and design $200,000

Construction $2,000,000

Total funding $2,200,000

C. Plans, design, and construction to replace skylights and storm louvers in buildings B and C.

Plans and design $25,000

Construction $250,000

Total funding $275,000

D. Plans, design, and construction to resurface the driveway and parking lot.

Plans and design $90,000

Construction $900,000

Total funding $990,000

E. Plans, design, and construction to repair campus wide irrigation system.

Plans and design $15,000

Construction $150,000

Total funding $165,000

F. Plans, design, and construction for a school-wide renovation.

Plans and design $161,700

Construction $1,617,000

Total funding $1,778,700

6. Mililani middle school, Oahu

A. Design and construction for replacement of campus wide fire alarm system including system monitoring.

Design $20,000

Construction $2,000,000

Total funding $2,020,000

B. Plans, design, and construction for replacement of air conditioning chiller unit in building D.

Plans and design $22,000

Construction $220,000

Total funding $242,000

C. Plans, design, and construction for concrete walkway repairs between buildings G, E, and A.

Plans and design $26,000

Construction $260,000

Total funding $286,000

D. Plans, design, and construction for air conditioner efficiency replacement.

Plans and design $109,031.20

Construction $1,090,312

Total funding $1,199,343.20

E. Plans, design, and construction for replacement of exterior soffits in building E.

Plans and design $30,000

Construction $300,000

Total funding $330,000

F. Plans, design, and construction to replace exterior soffits in building C.

Plans and design $30,000

Construction $300,000

Total funding $330,000

G. Plans, design, and construction for waterproofing the playcourt wall.

Plans and design $20,000

Construction $200,000

Total funding $220,000

H. Plans, design, and construction for replacement of folding doors on building F.

Plans and design $20,000

Construction $200,000

Total funding $220,000

I. Plans, design, and construction for resurfacing the basketball court.

Plans and design $29,500

Construction $295,500

Total funding $324,500

7. Mililani Uka elementary school, Oahu

A. Design and construction for the installation of ceiling fans across campus.

Design $15,000

Construction $150,000

Total funding $165,000

B. Plans, design, and construction to replace the existing waterline.

Plans and design $14,000

Construction $140,000

Total funding $154,000

C. Plans, design, and construction to replace the irrigation system campus wide.

Plans and design $15,000

Construction $150,000

Total funding $165,000

D. Plans, design, and construction to resurface the concrete parking lot.

Plans and design $14,400

Construction $144,000

Total funding $158,400

E. Plans, design, and construction to replace the campus fire alarm system, including system monitoring.

Plans and design $200,000

Construction $2,000,000

Total funding $2,200,000

F. Plans, design, and construction to reroof P-6, P-7, and P-12.

Plans and design $10,000

Construction $100,000

Total funding $110,000

SECTION 2. The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that all moneys from the appropriation that are unencumbered as of June 30, 2028, shall lapse as of that date.

SECTION 3. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the department of education for the purposes of this Act.

SECTION 4. This Act shall take effect on July 1, 2025.

INTRODUCED BY:

_____________________________

Report Title:

CIP; 38th Representative District; Appropriation

Description:

Authorizes the issuance of general obligation bonds and appropriated funds for capital improvement projects in the 38th representative district.

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

Source: Hawaiʻi State Legislature · Retrieved Nov 9, 2026 · Source document ↗